Barotrauma

Barotrauma

Daedalus
Menampilkan1-6 dari 6 kiriman
Pembaruan: 18 Nov @ 6:36pm
berdasarkan Vaqu

Changed bridge colour palette.

Pembaruan: 16 Nov @ 4:03pm
berdasarkan Vaqu

Moved the ballast overdive system into a circuit box.

Pembaruan: 15 Nov @ 4:25pm
berdasarkan Vaqu

Added ballast tanks flooding system.

Pembaruan: 13 Nov @ 3:53pm
berdasarkan Vaqu

Fixed the water lock in the engineering and kitchen.

Pembaruan: 10 Nov @ 7:40pm
berdasarkan Vaqu

Alarm, stove and links in the kitchen fixed. Pantry added, doors in the kitchen replaced for ones with windows.

Pembaruan: 10 Nov @ 6:34pm
berdasarkan Vaqu