Train Simulator Classic
North Wales Coast Line (TfW) Enhanced 2024 [Final]
Показване на 1 — 10 от 15 постъпления
< 1  2 >
Обновление: 30 март в 6:36

- Route Marker Updates.
- Tracks and scenery upgrades in and around the Crewe area.
- Independent Lines signalling changes in Crewe.
- Tracks and scenery added from Crewe to Nantwich.
- Quick Drives added to/from Nantwich.

Обновление: 26 февр. в 9:04

- More portals added.
- More line names added to give more options in scenario routing.
- 3 miles of tracks and scenery added from Chester towards Wrexham.

Обновление: 17 февр. в 8:34

- All signalling updated between Holyhead and Llandudno Junction.
- Changes to Holyhead platform 2 (extended).
- Station platform updates between Holyhead and Bangor.
- Tunnel scenery updates at Penmaenmawr.
- Trackside scenery updates near Llandudno Junction.

- Added more Quick Drive start and end locations.
- Minor scenery updates at Chester East Junction.

- All tunnels and viaducts shown in the sectional appendix are now named in the route.

Обновление: 13 февр. в 6:30

- Quick Drives updated
- Some speed signs changed


Changes at Crewe...

- CE133 signal added.
- Changes to tracks behind platform 12.
- Track changes at Crewe Steel works to match the current layout.

Обновление: 31 ян. в 6:10

Changes at Crewe...

- CE 151 signal on platform 6 added.
- CE 149 signal routings changed due to 151 being added.
- Many signals in the area have been renumbered.


Urgent fix applied to the signals at Chester - reverted to previous 3 bulb signals at the Crewe end of station due to theatre boxes on the new single bulb signals continuously showing 0 - I guess there is a bug in the script for those. Signals all now working as they should.

Обновление: 30 ян. в 9:14

Changes at Chester station...

- AWS magnets removed in the station area (there are none in the real world).
- Signalling updates at the Crewe end of the station.**
- Foot crossing added at the Crewe end of the station.


Changes between Chester and Crewe...

- Beeston Castle area has minor signalling and speed limit sign changes.
- TPWS grids added/removed where needed.
- Missing foot crossings added.
- Signal type and number changing.
- OHLE (overhead wire) structures changed near Steel Works signal box.
- Track speeds updated on approach to Crewe.
- Missing GSMR masts / cabinets added.


Changes to the Chester to Warrington line...

- Up and Down Warrington lines are now correctly named.**
- Additional tracks and signalling added.
- New portals added.
- Track extended as far as Mickle Trafford Junction.


**Signals will now show D or U correctly when departing Chester at the Crewe end of the station.

Обновление: 14 ян. в 11:39

Quick Drives updated - more start locations added

Обновление: 14 ян. в 5:48

Updates in Chester:

- Track direction changes
- Signalling changes
- Speed limit changes



Updates between Llandudno Junction and Holyhead

- Track directions changes
- Additional track markers added
- Portals added
- Minor trackside scenery additions

Обновление: 23 дек. 2024 в 7:07

Final work in progress upload before releasing to the public.

Обновление: 21 дек. 2024 в 9:41

Added additional track markers from the sectional appendix