安装 Steam
登录
|
语言
繁體中文(繁体中文)
日本語(日语)
한국어(韩语)
ไทย(泰语)
български(保加利亚语)
Čeština(捷克语)
Dansk(丹麦语)
Deutsch(德语)
English(英语)
Español-España(西班牙语 - 西班牙)
Español - Latinoamérica(西班牙语 - 拉丁美洲)
Ελληνικά(希腊语)
Français(法语)
Italiano(意大利语)
Bahasa Indonesia(印度尼西亚语)
Magyar(匈牙利语)
Nederlands(荷兰语)
Norsk(挪威语)
Polski(波兰语)
Português(葡萄牙语 - 葡萄牙)
Português-Brasil(葡萄牙语 - 巴西)
Română(罗马尼亚语)
Русский(俄语)
Suomi(芬兰语)
Svenska(瑞典语)
Türkçe(土耳其语)
Tiếng Việt(越南语)
Українська(乌克兰语)
报告翻译问题









The Sixth (6th) screenshot with the "Hey Metalmen, " note has since been moved to the Fifth (5th) archive block/area under the Title/Letter " O ". Just down at the very back and to the Right on the Second (2nd) self you can see that note in front of the beer.
Whenever the note may have been moved, I am not quite sure.
Hoping my formatting works first-time and that this helps anyone else out.
P.S. I do have the screenshot of this already, I just need a way to try to upload it. I will try to get on that as soon as I can.
The sequence of the steps is also suboptimal and seems to have been derived by experimentation rather than understanding how water treatment facility works. For example, I would definitely close off the sewer drains into the big raw water pool and the big flocculation pool _before_ starting the sewer pump in step (5). However, the game does not seem to care about this as long as you get the combination right in the end.