Out of Ore

Out of Ore

评价数不足
small Layout for 100% processing
由 Hyperserver 制作
Here's one of my small and compact layouts, still being able process all type of input into bars.
Starting with an already pretty small 30 x 20 layout to explain the ressorce flows, and last but not least compressing it down to a 16 x 13 Grid.
   
奖励
收藏
已收藏
取消收藏
Description:
"Game version: 0.31.4101

This is one of my compact layouts to process all types of input into most profitable products (bars).
It also breaks down all kind of stones into Gravel and gets more ores out of it.
Remaining Dirt will be sold automatically.
The use of 2 "Trommel" is because i want to remove the ores from dirt and paydirt, so that the washing plant does not jamm up.
The second one finally removes the dirt to be sold automatically.
This setup only needs 1 Input (10x speed) and can handle even big loads of input.
It is really compact and even already with the size of 30 x 20 tiles (60 x 40 meters), it fits even in small spaces.
Except the input drop box everything build on the same niveau - nothing is hidden underneath.

The second one is the first part of the first one, in case you do not have the funds to build it completely, so that you still can start using it for low tier input.
The purpose i did this setup has been to show you the general "flow" of all ressources in a way it's still "understandable" and not too confusing to lokk at it.

In another guide i did a full "compressed" setup (15 x 9 tiles XD).
In fact, it's a slightly different material flow than this one and therefore i removed it from this guide to put it in another dedicated one - you may have a look in there too.
Basic Layout Screenshot - showing the devices and the "ressource-flow" in general
Full Material List (including Dump area with 8 non-visible parts)
PRODUCT
amount
price each (full skilled)
price total
price each (no skills)
price total
Bar Roller
1
$ 9.650,00
$ 9.650,00
$ 10.000,00
$ 10.000,00
Big Hopper
4
$ 4.343,00
$ 17.372,00
$ 4.500,00
$ 18.000,00
Chute
1
$ 1.448,00
$ 1.448,00
$ 1.500,00
$ 1.500,00
Coal Screen
1
$ 7.238,00
$ 7.238,00
$ 7.500,00
$ 7.500,00
Cone Crusher
1
$ 53.075,00
$ 53.075,00
$ 55.000,00
$ 55.000,00
Down 4x4
3
$ 4.343,00
$ 13.029,00
$ 4.500,00
$ 13.500,00
Dump Deck
32
$ 2.413,00
$ 77.216,00
$ 2.500,00
$ 80.000,00
Elevator 8m
2
$ 4.343,00
$ 8.686,00
$ 4.500,00
$ 9.000,00
Froth Floater
1
$ 7.238,00
$ 7.238,00
$ 7.500,00
$ 7.500,00
High Temp Smelter
1
$ 9.650,00
$ 9.650,00
$ 10.000,00
$ 10.000,00
High Temp Sorter
1
$ 7.913,00
$ 7.913,00
$ 8.200,00
$ 8.200,00
Jaw Crusher
1
$ 43.425,00
$ 43.425,00
$ 45.000,00
$ 45.000,00
Left 2x
13
$ 4.343,00
$ 56.459,00
$ 4.500,00
$ 58.500,00
Merger
3
$ 5.308,00
$ 15.924,00
$ 5.500,00
$ 16.500,00
Pipe Left 2m
3
$ 4.343,00
$ 13.029,00
$ 4.500,00
$ 13.500,00
Pipe Right 2m
1
$ 4.343,00
$ 4.343,00
$ 4.500,00
$ 4.500,00
Pipe Splitter
1
$ 5.308,00
$ 5.308,00
$ 5.500,00
$ 5.500,00
Pipe Straight 2m
2
$ 1.448,00
$ 2.896,00
$ 1.500,00
$ 3.000,00
Pipe Straight 4m
1
$ 2.413,00
$ 2.413,00
$ 2.500,00
$ 2.500,00
Pipe Straight 8m
4
$ 4.343,00
$ 17.372,00
$ 4.500,00
$ 18.000,00
Power Cable
3
$ 10,00
$ 30,00
$ 10,00
$ 30,00
Power Input 10x Speed
1
$ 120.625,00
$ 120.625,00
$ 125.000,00
$ 125.000,00
Power Pylon 5400 kW
1
$ 11.580,00
$ 11.580,00
$ 12.000,00
$ 12.000,00
Right 2x
6
$ 4.343,00
$ 26.058,00
$ 4.500,00
$ 27.000,00
Sellpoint
1
$ 12.545,00
$ 12.545,00
$ 13.000,00
$ 13.000,00
Shaker Screen
1
$ 7.238,00
$ 7.238,00
$ 7.500,00
$ 7.500,00
Smelter
1
$ 9.650,00
$ 9.650,00
$ 10.000,00
$ 10.000,00
Storage
3
$ 6.273,00
$ 18.819,00
$ 6.500,00
$ 19.500,00
Straight 2m
1
$ 1.448,00
$ 1.448,00
$ 1.500,00
$ 1.500,00
Straight 4m
7
$ 2.413,00
$ 16.891,00
$ 2.500,00
$ 17.500,00
Straight 8m
2
$ 4.343,00
$ 8.686,00
$ 4.500,00
$ 9.000,00
Trommel
2
$ 7.238,00
$ 14.476,00
$ 7.500,00
$ 15.000,00
Up 4x4
2
$ 4.343,00
$ 8.686,00
$ 4.500,00
$ 9.000,00
Up 8x6
2
$ 4.343,00
$ 8.686,00
$ 4.500,00
$ 9.000,00
Washplant
1
$ 7.238,00
$ 7.238,00
$ 7.500,00
$ 7.500,00
Water Pump
1
$ 1.448,00
$ 1.448,00
$ 1.500,00
$ 1.500,00
Water Refinery
1
$ 7.527,00
$ 7.527,00
$ 7.800,00
$ 7.800,00
Wind Turbine 180
2
$ 109.431,00
$ 218.862,00
$ 113.400,00
$ 226.800,00
TOTAL (skilled)
$ 874.177,00
TOTAL (unskilled)
$ 905.830,00
Particially Temporary Layout (Paydirt and Coal only)
This is the minimal part of the first layout:
(no need more in early game, as you nearly only get Dirt, Paydirt, Coal and lower tier Ores anyways)

- using 1x speed power input
- not processing stones
- not processing/melting higher value ores (but stores them)
- no auto selling Dirt (storing it)
- still this is exactly the same layout as the previous one and can be extended whenever you got the funds (no items used which will later be needed anyways, except 1x speed input -> 10x speed input)

Therefore it is MUCH cheaper (less than half the price)


Material List for minumum configuration part (early game)
PRODUCT
amount
price each (full skilled)
price total
price each (no skills)
price total
Bar Roller
1
$ 9.650,00
$ 9.650,00
$ 10.000,00
$ 10.000,00
Big Hopper
1
$ 4.343,00
$ 4.343,00
$ 4.500,00
$ 4.500,00
Coal Screen
1
$ 7.238,00
$ 7.238,00
$ 7.500,00
$ 7.500,00
Down 4x4
3
$ 4.343,00
$ 13.029,00
$ 4.500,00
$ 13.500,00
Dump Deck
8
$ 2.413,00
$ 19.304,00
$ 2.500,00
$ 20.000,00
Elevator 8m
1
$ 4.343,00
$ 4.343,00
$ 4.500,00
$ 4.500,00
Left 2x
8
$ 4.343,00
$ 34.744,00
$ 4.500,00
$ 36.000,00
Merger
3
$ 5.308,00
$ 15.924,00
$ 5.500,00
$ 16.500,00
Pipe Left 2m
2
$ 4.343,00
$ 8.686,00
$ 4.500,00
$ 9.000,00
Pipe Splitter
1
$ 5.308,00
$ 5.308,00
$ 5.500,00
$ 5.500,00
Pipe Straight 2m
2
$ 1.448,00
$ 2.896,00
$ 1.500,00
$ 3.000,00
Pipe Straight 4m
1
$ 2.413,00
$ 2.413,00
$ 2.500,00
$ 2.500,00
Pipe Straight 8m
2
$ 4.343,00
$ 8.686,00
$ 4.500,00
$ 9.000,00
Power Cable
1
$ 10,00
$ 10,00
$ 10,00
$ 10,00
Power Input 1x Speed
1
$ 1.448,00
$ 1.448,00
$ 1.500,00
$ 1.500,00
Right 2x
4
$ 4.343,00
$ 17.372,00
$ 4.500,00
$ 18.000,00
Shaker Screen
1
$ 7.238,00
$ 7.238,00
$ 7.500,00
$ 7.500,00
Smelter
1
$ 9.650,00
$ 9.650,00
$ 10.000,00
$ 10.000,00
Storage
3
$ 6.273,00
$ 18.819,00
$ 6.500,00
$ 19.500,00
Straight 2m
2
$ 1.448,00
$ 2.896,00
$ 1.500,00
$ 3.000,00
Straight 4m
6
$ 2.413,00
$ 14.478,00
$ 2.500,00
$ 15.000,00
Trommel
2
$ 7.238,00
$ 14.476,00
$ 7.500,00
$ 15.000,00
Up 4x4
2
$ 4.343,00
$ 8.686,00
$ 4.500,00
$ 9.000,00
Up 8x6
1
$ 4.343,00
$ 4.343,00
$ 4.500,00
$ 4.500,00
Washplant
1
$ 7.238,00
$ 7.238,00
$ 7.500,00
$ 7.500,00
Water Pump
1
$ 1.448,00
$ 1.448,00
$ 1.500,00
$ 1.500,00
Water Refinery
1
$ 7.527,00
$ 7.527,00
$ 7.800,00
$ 7.800,00
Wind Turbine 180
1
$ 109.431,00
$ 109.431,00
$ 113.400,00
$ 113.400,00
TOTAL (skilled)
$ 361.624,00
TOTAL (unskilled)
$ 374.710,00
10 条留言
Bohdan 11 月 16 日 上午 10:31 
Thank you for making this. I'm returning to game and a LOT has changed, this helps a lot while I figure thing out.
Hyperserver  [作者] 11 月 5 日 上午 8:05 
not in the other version (max compressed - 15x9) lol
Big Dog 11 月 5 日 上午 4:30 
Very nice layout! There appears to be room for the oil derrick and the asphalt plant.
Hyperserver  [作者] 11 月 1 日 上午 9:37 
@Rhoktar - you should check out my other guide - it's even more compressed. Even though i removed one Trommel and also the high temp sorter. They aren't needed in singleplayer as the whole plant can do the workload easy as long as you use 10x.
My record is now nearly 15 x 9 - hehhe
Rhoktar 10 月 31 日 下午 4:55 
I love this! I thought I could beat you with careful conveyor layout - I put it together on a smaller footprint but when I put the power x10 on at the end and checked the power draw I was about 2 conveyors worse than yours :D
Hyperserver  [作者] 10 月 26 日 下午 3:55 
yeah - sure - thanks for your input. I will do a complete overhaul and get rid of all not really necessary parts - then i will cut the minmax part off this guide and do another one especially dedicated for that.
I most likely will leave the first part for those who want a compromise between small and "easy to understand).
The other one (new) will be solely for "minmax-challenge".
Tobiteufel 10 月 26 日 下午 2:09 
I´m always happy to see people do guides. A while ago I started to play the game again and all the machines from 3 years ago were changed. And there where no guides that showed anything. Only one outdated guide.
So I had to figure out much by trail and error. Then done a guide by myself.

Doing a "small as possible" Plant was never in my mind (of building or using). But its cool to see somebody doing it.
Hyperserver  [作者] 10 月 26 日 下午 12:15 
@tobiteufel:
confirmed issue with crates don't drop. Fixed and updated. Thanks again for pointing out.
Hyperserver  [作者] 10 月 26 日 上午 11:13 
thanks for your kind words. i'll have an eye on your mentionned flaws in 16 x 13 grid - it should work fine on 30x20 grid though. I put the first Trommel on purpose to avoid to jamm the washplant too much by pre-selecting ores. it didn't waste any space that much anyways as it fits into a straight line perfectly. And for Iron, i decided against it on purpose as Steel is more worthy. I didn't intend to produce all bars, just to process all ores into bars at all XD
Tobiteufel 10 月 26 日 上午 10:54 
Hey, good Guide. Gets a like from me :47_thumb_up:.
If you want to build it most minimalsitic possible. You can throw out the first tromel (Nr 6 in the first pic).
The only thing that could be added in the system would be producing iron bars.
(Iron ore + Smelter = Iron)
(Iron ore + Hight Temp Smelter = Steel)

I see one flaw. Where something sould NOT work as intended:
In the "minmax down to 16x13" (last pic) you want to let the wooden boxes with melted material from the Smelter fall on the belt directly infront of the Bar Roller. -> Until now boxes dont fall down. They just stop at the end of the Belt.

What I can´t say is, if you lose material throught merging via letting material fall directly on a belt that has already material on it. That depends on the the amount and kind of material you feed in the system. If you can squeez in a small hopper or a merger it should be fine (Since this update the Mergers don´t delete overflow).

But overall a good guide.